Swanson Renovations — Luxury Design and Build

Service

Bathroom Remodeling in Trophy Club, TX

Spa-grade primary baths for Trophy Club homeowners — The Highlands, Hogan's Glen, Eagle's Ridge. Southlake-grade craftsmanship at corridor-baseline pricing. $90K-$230K typical scope, 10-16 weeks construction.

A luxury bathroom remodel in Trophy Club typically reworks 120-320 square feet of bath and adjacent closet space, installs a frameless walk-in shower, a freestanding tub, a furniture-style double vanity with a natural stone or premium engineered top, and a custom closet system. Most Trophy Club primary baths land in the $90,000 to $230,000 range as of 2026 — roughly 8-12% under identical Southlake scope, with the same finish standard.

Bathroom remodeling for Trophy Club homes.

Trophy Club primary baths carry the same aging-out pattern as the rest of the 1995-2015 luxury stock across The Highlands, Hogan’s Glen, and Eagle’s Ridge — a corner tub nobody uses, a half-wall tiled shower, a vanity without real task lighting. The fix is the same discipline we run in Vaquero and Westlake, at corridor-baseline pricing: rebuild toward a real spa experience, not just a surface refresh.

Three primary-bath scopes we run most in Trophy Club.

Primary bath refresh.

Existing footprint stays. Shower rebuild, tub removal, vanity replacement, tile refresh, lighting redesign, closet system upgrade. Budget: $90,000-$150,000. Timeline: 10-14 weeks.

Spa-grade primary bath.

Full-scope rework with steam shower, freestanding tub, custom vanity millwork, heated stone floors, integrated closet system. Budget: $150,000-$230,000. Timeline: 12-16 weeks.

Primary suite addition.

Where the original suite is undersized — common in Trophy Club’s 1995-2015 housing stock — we add square footage for a new primary bedroom, spa bath, and closet, and convert the original into a guest room or office. Budget: $260,000-$495,000.

What’s included in a Swanson Trophy Club bath contract.

  • Design coordination with your interior designer on tile, slabs, vanity millwork, lighting, plumbing fixtures, hardware.
  • Slab sourcing at DFW yards, with you and your designer.
  • Town of Trophy Club permits.
  • ARB / HOA submission when scope requires it — required in Hogan’s Glen and certain Highlands sections for exterior changes.
  • Demolition + haul-off.
  • Framing changes where needed — curbless shower entries, expanded footprints, closet expansion.
  • Waterproofing. Kerdi membrane, hot mop, or Wedi board depending on scope, with an independent leak-check before tile.
  • MEP rework. Plumbing re-routing, electrical for lighting + steam generator + heated floor, HVAC balance.
  • Tile installation. Full-height shower walls when the design supports it.
  • Vanity millwork. Custom furniture-style bases.
  • Countertops. Natural stone or premium engineered.
  • Plumbing fixtures + lighting + hardware, coordinated with your designer’s spec.
  • Custom closet system where scope includes closet.
  • Project management. BuilderTrend, weekly walkthroughs, Nancy as single point of contact.
  • Site protection. Ram-board on floors, dust barriers, daily cleanup.

Ready to talk about your Trophy Club bath?

Talk to Chad about your project — the first conversation is sixty to ninety minutes in your home, no pitch. Bring your interior designer if you have one; we’ll introduce you to one if you don’t.

Frequently asked questions

What does a bathroom remodel cost in Trophy Club?
Most Trophy Club primary baths we remodel land in the $90,000 to $230,000 range as of 2026 — the DFW-corridor baseline, about 8-12% under identical Southlake scope. The gap is ARB overhead and lot premiums, not finish quality; the crews, materials, and standards are the same. Spa-grade suites with steam shower and custom vanity millwork push toward the higher end.
How long does a Trophy Club bathroom remodel take?
Active construction: 10-16 weeks for a primary bath, the same as our Southlake projects. Pre-construction: 6-10 weeks including design coordination, ARB review where applicable (Hogan's Glen and certain Highlands sections), Town of Trophy Club permits, and material lead times. From first consultation to keys: 4-6 months for a typical Trophy Club primary bath.
Does Hogan's Glen require architectural review for a bath remodel?
Only if the scope touches the exterior — a bumped-out bay for a freestanding tub, for example. Interior-only bath remodels usually stay below the review threshold. When a submission is required, we draft the full package as part of the contract. Town of Trophy Club permits are required regardless.
Can we live in the house during a Trophy Club bath remodel?
Yes, as long as there's another functional bathroom in the home. We set up dust barriers around the active bath and protect the adjacent bedroom floors, and you continue using the rest of the house normally.
Do you do steam showers in Trophy Club primary baths?
Yes — steam-rated tile, a sloped ceiling, a steam generator, and proper electrical capacity. Budget add: $8,500-$18,000 typically, on top of the base remodel scope.
Which Trophy Club neighborhoods do you work in?
Our core Trophy Club bath work is concentrated in The Highlands — the town's largest luxury concentration — along with Hogan's Glen and Eagle's Ridge. Homes here are largely 1995-2015 builds, so the remodel patterns are consistent: primary baths a design generation old, with corner tubs and half-wall showers ready for a real spa rebuild.
Do you provide 3D renderings, or do I need to bring my own drawings?
Yes — every Swanson estimate includes 3D renderings of your bathroom as part of the design phase, so you can see the finished space before a single wall comes down. If you're working with a designer who needs an extra hand, we also draft floor plans and renderings in-house. If you don't have a designer yet, we can develop the drawings ourselves or introduce you to one we trust.

Included On Every Project

See it before we build it.

Every Swanson estimate includes 3D renderings of your project, so you can see it before a single wall comes down. If you're working with a designer who needs an extra hand, we also draft floor plans and renderings in-house — happy to help wherever your team's process leaves off.

Inquire

Talk to Chad about your bathroom.

First conversation is sixty to ninety minutes in your home. No pitch.

Inquire
Inquire